PROJECT SCOPE
FAT and SAT support services
Work with a FAT consultant Europe manufacturers and engineering teams can use to prepare, witness and document Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) for industrial equipment and automation systems.
The employer chooses the talent, agrees the equipment, test scope, deliverables, timeline and rate, then manages the collaboration directly.
- Define the equipment and systems included in testing
- Prepare agreed FAT and SAT test activities
- Record test results and outstanding actions
- Support equipment acceptance and commissioning readiness
SCOPE
What a FAT consultant Europe can support
FAT and SAT support can cover test planning, equipment verification, issue tracking and technical documentation before and after industrial equipment reaches site.
FAT planning
Support can include:
- Reviewing equipment scope
- Understanding functional requirements
- Defining test activities
- Preparing test records
- Clarifying acceptance criteria
- Organising required evidence
Factory acceptance testing
A factory acceptance testing engineer can support agreed testing before equipment leaves the manufacturer or integration environment.
SAT planning
A SAT consultant Europe teams use can help prepare testing for the installed equipment, interfaces and operating environment.
Site acceptance testing
A site acceptance testing engineer can support agreed checks after installation to confirm the equipment and connected systems perform as expected within the defined scope.
Controls and automation testing
Testing can include agreed control sequences, PLC functions, HMI behaviour, signals and automated operating conditions.
Interface testing
A consultant can help verify agreed interfaces between machines, controls, production systems and other connected equipment.
Issue and action tracking
Test findings can be recorded with clear status, responsibility and agreed follow-up before final acceptance.
Commissioning readiness
FAT and SAT outputs can support the transition into wider installation and commissioning activities.
Test documentation
Existing FAT or SAT documentation can be reviewed and improved where test steps, evidence or acceptance records need clearer structure.
WHEN IT HELPS
When businesses use FAT and SAT support
FAT and SAT support can help when industrial equipment needs structured testing before shipment, after installation or during the transition into commissioning.
Check equipment before shipment
Factory testing can help the employer review agreed functions, controls and interfaces before equipment moves to site.
Verify installed equipment
Site testing can help confirm that agreed functions and system interfaces operate within the installed environment.
Create a clear record of outstanding actions
Testing can identify items that need adjustment, completion or retesting before the agreed acceptance process continues.
Prepare the essentials
Useful starting information includes:
- Equipment and systems in scope
- Functional requirements
- Existing test procedures
- Control-system documentation
- Interface information
- Acceptance criteria
- The testing outcome you need
DELIVERABLES
Typical scope and deliverables
FAT and SAT work can be structured around test preparation, execution support, findings review and final documentation.
Getting started
At the beginning of the job, the employer and talent can review:
- Equipment scope
- Functional requirements
- Existing test plans
- Control architecture
- System interfaces
- Acceptance requirements
Testing support
The talent carries out the agreed FAT or SAT activities.
Deliverables might include test procedures, completed test records, issue logs, evidence registers or agreed retest actions.
Quality and feedback
Test findings can be reviewed with the employer and relevant engineering teams so failed, incomplete or outstanding items are clearly recorded.
Handover and continuity
Where useful, include completed test documents, outstanding-action records, evidence and handover notes that support commissioning and later project activities.
TALENTS
Talents and skills involved
The right experience depends on the machinery, automation environment, test scope and site conditions included in the job.
FAT experience
Relevant experience can include preparing or supporting structured factory testing for industrial equipment and automation systems.
SAT experience
Site-testing experience can be useful where installed equipment, utilities and connected systems need agreed verification.
Controls and automation experience
Some jobs benefit from experience with PLCs, HMIs, industrial networks and machine interfaces.
Experience level
Testing one defined machine may require different experience from supporting FAT and SAT across a wider production line or integrated system.
Choose the experience level that fits the job.
Tools and systems
Include the technical environment the talent will work with.
For example:
- PLCs and controllers
- HMI or SCADA systems
- Electrical drawings
- Industrial networks
- Existing test documentation
This helps talents understand the working environment before they apply.
Explore role-selection guidance
JOB
How to write the job
A useful FAT and SAT job explains the equipment, testing stage, functional requirements and acceptance outcome you need.
Describe the outcome
Explain what you want the work to achieve. For example:
- Prepare a FAT procedure
- Support factory acceptance testing
- Prepare site acceptance testing
- Witness agreed equipment tests
- Document test findings and outstanding actions
Define the test scope
List the machines, controls, interfaces and operating functions included in the job.
Explain whether the work covers FAT, SAT or both.
Add the technical context
Include details such as:
- Equipment type
- PLCs and controls
- Functional requirements
- Existing test procedures
- System interfaces
- Installation status
- Acceptance criteria
Explain the engagement
State whether you need:
- FAT preparation
- Factory testing support
- SAT preparation
- Site testing support
- Test documentation and follow-up
The employer and talent can refine the scope, timeline and rate after starting a conversation.
EVALUATION
How to compare FAT and SAT consultants
Start with relevant equipment and testing experience, then discuss how the talent would prepare, execute and document the agreed acceptance activities.
Relevant testing experience
Look for examples involving machinery, automation systems or industrial equipment similar to those included in your job.
Test-planning approach
Ask how the talent would turn functional requirements and acceptance criteria into practical test activities.
Controls understanding
Discuss experience with PLCs, HMIs, signals and automation sequences where these form part of the test scope.
Issue management
Ask how failed, incomplete or outstanding test items would be recorded and prepared for follow-up or retesting.
Deliverables and handover
Confirm which test procedures, completed records, evidence and outstanding-action documents will be delivered at the end of the job.
Talent profiles are reviewed and approved by the VirtualMasst team before employers can see them. The employer still decides which talent is right for the work.
COST
Cost, timeline and engagement factors
The employer and talent agree the rate directly. Several parts of a FAT and SAT job can affect the commercial structure.
Equipment scope
Testing one machine can require different work from supporting several machines or an integrated production system.
Test depth
A focused functional test can require different work from a wider test covering controls, interfaces and operating scenarios.
Documentation readiness
Existing procedures and acceptance criteria can affect how much preparation is needed before testing begins.
Number of interfaces
Several connected systems, controllers or machines can add testing and coordination work.
Location and site access
Factory and site testing may require different working arrangements depending on where the equipment is located.
Retesting needs
Outstanding items may require follow-up testing after adjustments or installation work is complete.
Related industrial work
If the job also includes industrial commissioning, PLC programming or virtual commissioning, define those deliverables separately so the FAT and SAT scope remains clear.
Current charges are listed on Pricing.
YOUR NEXT STEP
Find the right talent
Describe the equipment, functional requirements, testing stage, interfaces and acceptance outputs you need. Post the job and start a conversation with talents whose FAT, SAT and industrial automation experience fits the work.
The employer chooses the talent, agrees the scope, timeline and rate, manages the collaboration and approves the completed work.
Industrial automation services
YOUR NEXT STEP
Find the right talent
Describe the equipment, functional requirements, testing stage, interfaces and acceptance outputs you need. Post the job and start a conversation with talents whose FAT, SAT and industrial automation experience fits the work.
The employer chooses the talent, agrees the scope, timeline and rate, manages the collaboration and approves the completed work.
Post a job
Find FAT and SAT specialists

