top of page
images.png

0

0

VirtualMast-color.png

PROJECT SCOPE

FAT and SAT support services

Work with a FAT consultant Europe manufacturers and engineering teams can use to prepare, witness and document Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) for industrial equipment and automation systems.

The employer chooses the talent, agrees the equipment, test scope, deliverables, timeline and rate, then manages the collaboration directly.

Post a job

Find FAT and SAT specialists

  • Define the equipment and systems included in testing
  • Prepare agreed FAT and SAT test activities
  • Record test results and outstanding actions
  • Support equipment acceptance and commissioning readiness

Explore industrial services

 

SCOPE

What a FAT consultant Europe can support

FAT and SAT support can cover test planning, equipment verification, issue tracking and technical documentation before and after industrial equipment reaches site.

FAT planning

Support can include:

  • Reviewing equipment scope
  • Understanding functional requirements
  • Defining test activities
  • Preparing test records
  • Clarifying acceptance criteria
  • Organising required evidence

Factory acceptance testing

A factory acceptance testing engineer can support agreed testing before equipment leaves the manufacturer or integration environment.

SAT planning

A SAT consultant Europe teams use can help prepare testing for the installed equipment, interfaces and operating environment.

Site acceptance testing

A site acceptance testing engineer can support agreed checks after installation to confirm the equipment and connected systems perform as expected within the defined scope.

Controls and automation testing

Testing can include agreed control sequences, PLC functions, HMI behaviour, signals and automated operating conditions.

PLC programming

Interface testing

A consultant can help verify agreed interfaces between machines, controls, production systems and other connected equipment.

Issue and action tracking

Test findings can be recorded with clear status, responsibility and agreed follow-up before final acceptance.

Commissioning readiness

FAT and SAT outputs can support the transition into wider installation and commissioning activities.

Industrial commissioning

Test documentation

Existing FAT or SAT documentation can be reviewed and improved where test steps, evidence or acceptance records need clearer structure.

 

WHEN IT HELPS

When businesses use FAT and SAT support

FAT and SAT support can help when industrial equipment needs structured testing before shipment, after installation or during the transition into commissioning.

Check equipment before shipment

Factory testing can help the employer review agreed functions, controls and interfaces before equipment moves to site.

Verify installed equipment

Site testing can help confirm that agreed functions and system interfaces operate within the installed environment.

Create a clear record of outstanding actions

Testing can identify items that need adjustment, completion or retesting before the agreed acceptance process continues.

Prepare the essentials

Useful starting information includes:

  • Equipment and systems in scope
  • Functional requirements
  • Existing test procedures
  • Control-system documentation
  • Interface information
  • Acceptance criteria
  • The testing outcome you need

 

DELIVERABLES

Typical scope and deliverables

FAT and SAT work can be structured around test preparation, execution support, findings review and final documentation.

Getting started

At the beginning of the job, the employer and talent can review:

  • Equipment scope
  • Functional requirements
  • Existing test plans
  • Control architecture
  • System interfaces
  • Acceptance requirements

Testing support

The talent carries out the agreed FAT or SAT activities.

Deliverables might include test procedures, completed test records, issue logs, evidence registers or agreed retest actions.

Quality and feedback

Test findings can be reviewed with the employer and relevant engineering teams so failed, incomplete or outstanding items are clearly recorded.

Handover and continuity

Where useful, include completed test documents, outstanding-action records, evidence and handover notes that support commissioning and later project activities.

 

TALENTS

Talents and skills involved

The right experience depends on the machinery, automation environment, test scope and site conditions included in the job.

FAT experience

Relevant experience can include preparing or supporting structured factory testing for industrial equipment and automation systems.

SAT experience

Site-testing experience can be useful where installed equipment, utilities and connected systems need agreed verification.

Controls and automation experience

Some jobs benefit from experience with PLCs, HMIs, industrial networks and machine interfaces.

Experience level

Testing one defined machine may require different experience from supporting FAT and SAT across a wider production line or integrated system.

Choose the experience level that fits the job.

Tools and systems

Include the technical environment the talent will work with.

For example:

  • PLCs and controllers
  • HMI or SCADA systems
  • Electrical drawings
  • Industrial networks
  • Existing test documentation

This helps talents understand the working environment before they apply.

Explore role-selection guidance

 

JOB

How to write the job

A useful FAT and SAT job explains the equipment, testing stage, functional requirements and acceptance outcome you need.

Describe the outcome

Explain what you want the work to achieve. For example:

  • Prepare a FAT procedure
  • Support factory acceptance testing
  • Prepare site acceptance testing
  • Witness agreed equipment tests
  • Document test findings and outstanding actions

Define the test scope

List the machines, controls, interfaces and operating functions included in the job.

Explain whether the work covers FAT, SAT or both.

Add the technical context

Include details such as:

  • Equipment type
  • PLCs and controls
  • Functional requirements
  • Existing test procedures
  • System interfaces
  • Installation status
  • Acceptance criteria

Explain the engagement

State whether you need:

  • FAT preparation
  • Factory testing support
  • SAT preparation
  • Site testing support
  • Test documentation and follow-up

The employer and talent can refine the scope, timeline and rate after starting a conversation.

 

EVALUATION

How to compare FAT and SAT consultants

Start with relevant equipment and testing experience, then discuss how the talent would prepare, execute and document the agreed acceptance activities.

Relevant testing experience

Look for examples involving machinery, automation systems or industrial equipment similar to those included in your job.

Test-planning approach

Ask how the talent would turn functional requirements and acceptance criteria into practical test activities.

Controls understanding

Discuss experience with PLCs, HMIs, signals and automation sequences where these form part of the test scope.

Issue management

Ask how failed, incomplete or outstanding test items would be recorded and prepared for follow-up or retesting.

Deliverables and handover

Confirm which test procedures, completed records, evidence and outstanding-action documents will be delivered at the end of the job.

Talent profiles are reviewed and approved by the VirtualMasst team before employers can see them. The employer still decides which talent is right for the work.

 

COST

Cost, timeline and engagement factors

The employer and talent agree the rate directly. Several parts of a FAT and SAT job can affect the commercial structure.

Equipment scope

Testing one machine can require different work from supporting several machines or an integrated production system.

Test depth

A focused functional test can require different work from a wider test covering controls, interfaces and operating scenarios.

Documentation readiness

Existing procedures and acceptance criteria can affect how much preparation is needed before testing begins.

Number of interfaces

Several connected systems, controllers or machines can add testing and coordination work.

Location and site access

Factory and site testing may require different working arrangements depending on where the equipment is located.

Retesting needs

Outstanding items may require follow-up testing after adjustments or installation work is complete.

Related industrial work

If the job also includes industrial commissioning, PLC programming or virtual commissioning, define those deliverables separately so the FAT and SAT scope remains clear.

Current charges are listed on Pricing.

 

YOUR NEXT STEP

Find the right talent

Describe the equipment, functional requirements, testing stage, interfaces and acceptance outputs you need. Post the job and start a conversation with talents whose FAT, SAT and industrial automation experience fits the work.

The employer chooses the talent, agrees the scope, timeline and rate, manages the collaboration and approves the completed work.

Industrial commissioning

PLC programming

Industrial automation services

Virtual commissioning

Post a job

Find FAT and SAT specialists

 

YOUR NEXT STEP

Find the right talent

Describe the equipment, functional requirements, testing stage, interfaces and acceptance outputs you need. Post the job and start a conversation with talents whose FAT, SAT and industrial automation experience fits the work.

The employer chooses the talent, agrees the scope, timeline and rate, manages the collaboration and approves the completed work.

Post a job

Find FAT and SAT specialists

bottom of page